Journeyman PIpefitter

AUDIE D. DIVINAGRACIA        

2717 Cool Lilac Ave.

Henderson, NV 89052

Phone:  702 769 4540

Alt:  702 463 3645

mgdadd4@yahoo.com 

 

OBJECTIVE:

To gain an employment with a company where my Engineering background and technical knowledge in the field of construction can be applied effectively.

 

SUMMARY OF QUALIFICATIONS:

Applied established Engineering standard and principles in every work responsibilities to maintain an ensured quality work output.

 

Ensured that goals and objectives were accomplished in accordance with outlined schedule and priorities, safety and time limitation.

 

WORK HISTORY:

 

 

Ch2m Hill E&C Inc.(Power Division)

9191 South Jamaica Street, Englewood, CO 80112

Journeyman Pipefitter

 

January 2013 to present

Project:

PACIFIC CORPORATION – Lake Side 2 Power Plant, Vineyard, UT

635 MW Natural Gas-Fired  2X1 Combined-Cycle Power Plant

 

Work in the installation/erection of pipeworks and mechanical components connecting :

           Combustion Turbine ( Two Units ) :

              Rotor Air Cooler and Boiler System lines

              Fuel Gas lines / Fuel manifold  lines

              Lube oil  system lines

              Multi-stage Compressed Air and bleeder  system lines

 

           Steam Turbine Generator ( STG ) system :

              Internal Cooling system lines

              Steam condensate lines

             Reheat steam lines

             Main steam lines

             Turbine / Generator Lube oil  lines

 

          Auxilliary Boiler system :

             Superheated steam lines

             Feedwater system lines

 

          Water Treatment System :

             Raw water lines

             Demineralized water lines

                              

           

Works include lay out for Carbon steel, Chrome-Moly, and Stainless steel pipe material, rigging, spool fabrication, fit up/install pre fabricated pipe spools, valves, fittings, pipe supports, flange bolting and work with blue prints, shop drawings/specifications for every work assignment.

 

 

Brinderson Construction Inc.

19600 Wilmington Ave., Carson, CA 90746

Journeyman Pipefitter

 

 

October 2012 to  November 2012

Project:

OLIN CHLOR ALKALI,      Henderson, NV

 

Worked for the four-month shutdown of the HCL unit of the facility.

Works includes spool fabrication and installation, tie-ins of existing in-service lines to the newly installed lines that includes ¾ inch to 3 inches Carbon Steel ( Threaded/Socket Weld ) for:

            Hydrogen lines

            Nitrogen lines

            Instrument Air lines

            Utility Air lines

            Utility Water lines

 

Performed Tag out/Lock out for every system with the entire crew inside the facility, fit-up/install valves, fittings, pipe guides, slides, and anchors, flange bolting to a required torque, work with shop drawings/specifications for spool fabrication and installation.

           

 

 

Tech USA /  Interstate Mechanical Corporation

8222 S 48th Street, Phoenix, AZ 85044

Journeyman Pipefitter

 

July 2012  to October 2012

Project:

INTEL FAB 42  -  Chandler, AZ

 

Worked directly in the installation of pipeworks in the 65-foot high trestle connecting Process Utilities Building ( PUB ) and Fab 42 building:

 

           1 inch to 30 inches Carbon Steel pipes for:

               Chilled  Water System

               Heat Recovery Water System

               Secondary Heat Recovery Water System

               Hot Water  Recovery System

 

Works includes lay out for a butt weld joint system, rigging, torch cutting/beveling, flange bolting to a required torque, fit-up/install valves, fittings, pre-insulated pipe guides, slides, anchors and supports, works with blue prints, shop drawings and make detailed sketches, schematic drawings for spool fabrication and installation.

 

 

 

 

ALS  (a Division of)  E & O Mechanical Inc.,                                             800 Broadway, Haverhill, MA 01832

Journeyman Pipefitter

 

December 2011 to  July 2012

Project:

FAULTLESS  LAUNDRY  COMPANY -  St. Louis, MO

NEW YORK LAUNDRY COMPANY – Orangestad, Aruba

METROPOLITAN LINEN – Haverhill, MA

CLEANCARE LINEN – Pittsburgh, PA

 

Worked directly in the installation of pipeworks and mechanical components in the facility. Works include lay out of a butt weld joint  piping system, rigging, threading, torch cutting/beveling, bridge tack welding, soldering, brazing, flange bolting to a required torque, fit-up/install valves and fittings, hangers and supports, work with blueprints, shop drawings, specifications, and make detailed sketches, schematic drawings for fabrication and installation, use of testing equipment to check systems for leaks and assist in start up works of the system.

 

 

            

 

Alliance Mechanical Inc.,   Las Vegas, NV

Journeyman Pipefitter

 

February 2010 to April 2011

Project:

NEW VA MEDICAL CENTER,   Las Vegas, NV

 

 

Worked directly in the installation of pipeworks and mechanical components  in the Central plant:

 

           ½ inch to  16 inches  Carbon Steel  pipes  connecting:

                   3 Units - 24,000 Lbs/Hr @ 200Psig (700HP / 27.1 MBTU/HR) Steam Boiler

                   1 Unit -  2,450 Gal  Tank Storage capacity- Duplex Condensate System

                   1 Unit -  3,100 Gal/75,000Lbs/Hr  Feedwater/Deaerator and Storage Vessel

  

          ½ inch to 24 inches Carbon Steel pipes, and ½ inch to 4 inches  Copper pipes       connecting:

                                                                                                   

                  4 Units - 1,200 Tons  Water Chiller                          

                  4 Units - 120 HP/1850 Gpm-10 inches Chilled Water Pump

                  4 Units -125 HP/2400 Gpm-10 inches Condensing Water Pump         

                  4 Units -1,100 Tons Mechanical (Induced) Draft Counter Flow

                                Cooling Tower

                  1 Unit - 25 HP/750 Gpm- 6 inches   Auto-Purge Centrifugal Separator Cooling Tower water filtration system

             

Installation works include lay out of a butt weld and groove end joint system, rigging, measure, torch cutting/beveling, grinding, grooving, threading, bending, tack welding, soldering, brazing, flange bolting to a required torque, assemble, fit-up/install valves, fittings, hangers, pipe guides, anchors, work with Blueprints, shop drawings, Specifications and make detailed sketches, schematic drawings for fabrication and installation, use of testing equipment to check systems for leaks and assist in start up works of the systems.

 

Atlas Mechanical Inc.,  Las Vegas, NV 

Pipefitter

 

April 2006  to  May 2008

Project:

ONE LAS VEGAS TOWERS: Two twenty one-story Residential/Condominium Towers

                                                 Las Vegas, NV

 

BLUEGREEN RESORT ;  Seven-story Time Share Resort, Las Vegas, NV

 

 

Worked directly in the installation of pipeworks and mechanical components in the central plant (Hydronic Loop) of a Water Sourced Heat Pump system:

 

             ½ inch o 14 inches   Carbon  Steel  pipes  connecting:                

                  4,000 Lbs/Hr. @125 Psig/ 85HP  Hot Water Boiler

                 85 HP/ 1800 GPM- 6 inches  Condensing Water Pumps       

                750 Tons Mechanical (Induced) Draft CounterFlow Cooling Tower       

            ½ inch to 4 inches Copper pipes connecting all floors of the building

 

 

Works includes lay out of a butt weld and groove end  joint system, measure, threading, torch cutting/beveling, grooving, bending, grinding, tack welding, soldering, brazing, crimping, assemble, flange bolting, fit-up/install valves, fittings, pipe hanger, pipe guides, anchors and supports, work with Blueprints, shop drawings, Specifications, and make detailed sketches, schematic drawings for fabrication and installation, and use of testing equipment to check systems for leaks. 

 

 

 

DB  Corporation ,    Iloilo City, Philippines 

Pipefitter/Foreman / Supervisor

 

September 1988 to April 2005

 mProject:

80  TON per DAY - RICE MILLING PLANT

60 TON per YEAR - INTENSIVE CULTURE AQUA FARM

 

Worked as a Pipefitter during the seven month probationary period. Duties  and responsibilities includes installation and erection of ½ inch to 18 inches of  carbon steel and stainless steel pipes.

 

 

Supervision includes  repairs, modifications, preventive and predictive maintenance  on aqua farm and plant equipments, fixtures, and systems that includes:

             6 Units- 4.5 KW / 6.5 Ton  Auto-Moisture level Shut off  Grain Drier

             1 Unit –112 KW/140 KVA - 3PH/230V  Cummins Standby Generating set

             1 Unit - 2.2 KW / 3 Ton/Hr. Combined Cleaning Separator – use for    

                          precleaning, cleaning, and stoning grains.

           3 Units- 2.5 KW  / 1.5 Ton/Hr. Rubber Roller Huller – use  as paddy husker.

           7 Units- 1.5 KW Low - Speed Elevators- use to lift the grains vertically to fed

                         different grains processing machines.              

           3 Units- 120 HP / 1200 Gpm – 18”  2- Stage Vertical Turbine  Pumps – use to

                         maintain pond water elevation.

         48 Units- 1.5 KW  Low – Speed  Paddle Wheels- use to maintain  high level

                         of  dissolved oxygen on the water inside the pond.

           1 Unit- 105 KW/131 KVA- 3PH/230V  Lovol / Man Standby Generating set

 

Works includes estimates, plans, and executes high priority work orders for every

repair and maintenance works. Trains, develop, and disciplines subordinate staff.

 

 

 

 

Engineering Equipment Inc. (EEI),            Minah Abdullah, Kuwait

Braun Transworld Corp. (BTC)

Pipefitter Chargehand/Pipefitter Foreman

 

May 1986 to April 1988

Project:

KUWAIT NATIONAL PETROLEUM CORP. (KNPC)

Minah Abdullah Oil Refinery Modernazation Project

(270,000 BBL a Day  Atmospheric Crude Oil Distillation Oil Refinery)

 

Worked with an eight man crew in the retrofit works of existing Slipperway pipelines to Tank Farm, and worked with  Tie-ins  lines to existing In Service lines that includes:

1 inch to 36  inches Carbon Steel pipes .

 

Installation and retrofit works includes lay out, pipe cutting/beveling, grinding, assemble, flange bolting to a required torque, fit-up/install valves and fittings, pipe shoes,  performed Tag out/Lock out for every system worked, use of  pressurized balloons and mud packs inside pipelines to isolate gas fumes from existing in service line during Hot works, use of gas detecting device to check allowable level of gas fumes during Hot works, prepare and secure daily Hot work permit, and use of testing equipment to check systems for leaks.

 

 

 

Construction and Development Corp. of the Philippines (CDCP) 

Manila, Philippines

Engineering Trainee

 

May 1980 to December 1984

Project:

600 MGAL a DAY  LA MESA WATER TREATMENT PLANT

 

Worked directly in the field in the installation and erection of pipeworks  and mechanical components:

            20 inches Bell and Spigot Cast Iron pipes - Settling Basin  Sedimentation drain

                                 line.

            18 inches Spiral/Welded (Cement/Mortar lined) pipes connecting  - 3 Units - 

                       125 HP-110 GPM- 3 Stage -Vertical Turbine Pumps for Surface  Wash

                                Water system and in Water Filtration System.  

                                                         

           16 inches Spiral/Welded (Cement/Mortar lined) pipes connecting- 4 Units –

                       120 HP - 1000Gpm- 3 Stage -Vertical Turbine Pumps for Wash water

                                   Recovery System.

              

           6 inches Carbon Steel pipes connecting – 1 Unit  Constant Pressure / Variable

                      Speed Drive (2 – 4 inches Centrifugal Pumps) - for plant Domestic Water

                                   Supply system.

          ½ inch  to 4 inches PVC pipes connecting Flouridation, and Chlorination

                      System and in Filter water basin.

          48 Units -1.5 KW Motor Operated (Cast Iron)  Sluice Gates - for  Filter

                basin influent and Surface Washwater and Backwashing system effluent.

 

Works includes scheduling of materials, equipments, tools, and manpower required in the field, prepare Daily Foreman’s Report, lay out and works with Blueprints, shop Drawing, and Specifications, and make detailed sketches, schematic drawings  for fabrication and installation.

 

 

 

 

 

EDUCATION: 

 

University of San Agustin,       Iloilo City, Philippines

Bachelor of Science in Mechanical Engineering ,  1974-1979

Completed a Five-year curriculum of Bachelor of Science in Mechanical Engineering

 

CERTIFICATIONS:

 

Hydronic Piping   -   April, 2008 

Associated Builders and Contractors  Inc.,          Las Vegas, NV                                        (ABC  Las Vegas Chapter - Education Department)

 

HVAC Technology / Universal Technician/EPA 608 – September, 2005

Quality Technical Training Center ,   Las Vegas, NV

 

Occupational Safety and Health Administration (OSHA) : January, 20011

OSHA 10  and  OSHA 30

 

Shielded Metal Arc Weldng (SMAW/Stick ) – October, 1980

Dravo Skill Builders(CDCP/Dravo-Philippines) – Manila, Philippines

 

 

 

                                        

                               

 

 

 

 

 

 

 

  • ID#: 79762
  • Location: Henderson, NV , 89052

Don't Be Fooled

  • When selling, do not put your home address in your ad.
  • To avoid scams, buy and sell with people you can meet locally, in person.
  • When meeting with someone you don't know, meet in a public place. If that's not possible, have a buddy with you. Also, carry a cell phone; if you feel unsafe, you can call a trusted friend, and stay on the line.
  • Never give out financial or private information like account numbers, PayPal login, or social security number.
  • If an offer sounds too good to be true, it is. Walk away!

Look Who's Hiring!

Journeyman - Plumber
Reno, NV Renown Healthcare
OEM Journeyman Turbine Mechanics / Turbine Mil...
Carson City, NV Granite Services
Journeyman Hydroelectric Turbine Mechanics / H...
Carson City, NV Granite Services
Journeyman Industrial Instrument Technician fo...
Carson City, NV Granite Services
Pipefitter Fitter Fuser Gas Utility Constructi...
Las Vegas, NV NPL CONSTRUCTION